Regulators finish design assessment of new nuclear power station

LONDON, 08 February 2022, (TON): The Office for Nuclear Regulation (ONR) and the Environment Agency have confirmed that the UK Hualong Pressurised Water Reactor (UK HPR1000) is suitable for construction in the UK, subject to the necessary licensing, planning permission and environmental permits, following completion of their in-depth assessment of the nuclear reactor design.

The UK HPR1000 is based on the Hualong One power plant, designed by China General Nuclear Group (CGN).

The ONR and the Environment Agency, the regulators who carry out the Generic Design Assessment (GDA) of new reactor designs, are satisfied that this reactor meets regulatory expectations on safety, security and environmental protection at this stage of the regulatory process.

The regulators assess the acceptability of new nuclear power station designs in a process called Generic Design Assessment. This helps ensure that any new nuclear power stations built in the UK meet high standards of safety, security, environmental protection and waste management.

ONR has issued a Design Acceptance Confirmation (DAC) and the Environment Agency has issued a Statement of Design Acceptability (SoDA) to China General Nuclear, EDF and General Nuclear International Ltd, the partners in this GDA of the UK HPR1000.

Rate this item
(0 votes)
Login to post comments
Go to top